Nova

( Includes Routine Check ups and basic Pool Service)

Check Circulation Systems

Check Filter ( Pressure gauge, Valve, Cap )

Check Filter Media Inside the filter

Leakage if any to be arrested

Backwash to remove dirt

Pump basket Stainer Cleaning

Pump Suction Stainer Cleaning

Check Pumps for any Noise, Power Rating, Suction Basket

Ozonation

UV Systems

Inoization

Salt Chlorinator

Check whichever system is installed

Check Complete Performance of Heat pump and Circulation Pump

( Gas Refill, Display Panel, Compressor)

Temperature Check

Ph( Ideal 7.2 – 7.6)

Chlorine (1.5 – 2.5)

Alkalinity (80-120)

TDS

Total Hardness

Temperature ( If temperature Controlled Pool)

Advice Chemical Saving and Instruct Chemical Dosing

Pool Cleaning, Equipments & Pool Surroundings

Check Visually & Inspect all Gutter Channels

Check for any Grating replacement which needs to be done

Check lifesaving equipment( reach poles, throw rings, rescue tubes, backboard)

Check all fixtures in pool Visually( i.e Suction Nozzle, Drain Nozzle, Vaccum Nozzle, Underwater light if provided)

Checkup of all electrical parts in panel(( i.e All contractors, relay, MCBs, VFD, Timers, Starters if any)

Check for all loose cables and if found loose needs to be tight

Check for any cable replacement and inform the same to the client

Discover

( Includes complete maintenance plus routine chemical service)

Check Circulation Systems

Check Filter ( Pressure gauge, Valve, Cap )

Check Filter Media Inside the filter

Replace Filter media inside the filter

Leakage if any to be arrested

Open Backwash to remove dirt

Pump basket Stainer Cleaning

Pump Suction Stainer Cleaning

Check Pumps for any Noise, Power Rating, Suction Basket

Ozonation

UV Systems

Inoization

Salt Chlorinator

Check whichever system is installed

Check Complete Performance of Heat pump and Circulation Pump

( Gas Refill, Display Panel, Compressor)

Temperature Check

Ph( Ideal 7.2 – 7.6)

Chlorine (1.5 – 2.5)

Alkalinity (80-120)

TDS

Total Hardness

Temperature ( If temperature Controlled Pool)

Advice Chemical Saving and Instruct Chemical Dosing

Water Test Report

Check all fixtures in pool Visually( i.e Suction Nozzle, Drain Nozzle, Vaccum Nozzle, Underwater light if provided)

Checkup of all electrical parts in panel(( i.e All contractors, relay, MCBs, VFD, Timers, Starters if any)

Check for all loose cables and if found loose needs to be tight

Check for any cable replacement and inform the same to the client

Check all swimming pool lights functioning properly, its light panel box and cables. If any fault found to inform the client and get it replaced.

Check Visually & Inspect all Gutter Channels

Check for any Grating replacement which needs to be done

Check lifesaving equipment( reach poles, throw rings, rescue tubes, backboard)

Foot Valve

NRV

Tubing

Star

( Includes the complete Star  Maintenance Plan plus Complete Pool maintenance including Chemical)

Check Circulation Systems

Check Filter ( Pressure gauge, Valve, Cap )

Check Filter Media Inside the filter

Replace Filter media inside the filter

Leakage if any to be arrested

Open Backwash to remove dirt

Pump basket Stainer Cleaning

Pump Suction Stainer Cleaning

Check Pumps for any Noise, Power Rating, Suction Basket

Ozonation

UV Systems

Inoization

Salt Chlorinator

Check whichever system is installed

Check Complete Performance of Heat pump and Circulation Pump

( Gas Refill, Display Panel, Compressor)

Temperature Check

Ph( Ideal 7.2 – 7.6)

Chlorine (1.5 – 2.5)

Alkalinity (80-120)

TDS

Total Hardness

Temperature ( If temperature Controlled Pool)

Advice Chemical Saving and Instruct Chemical Dosing

Water Test Report

Pool Water Chemistry Balacing (Chemical to be provided by client)

Check all fixtures in pool Visually( i.e Suction Nozzle, Drain Nozzle, Vaccum Nozzle, Underwater light if provided)

Checkup of all electrical parts in panel(( i.e All contractors, relay, MCBs, VFD, Timers, Starters if any)

Check for all loose cables and if found loose needs to be tight

Check for any cable replacement and inform the same to the client

Check all swimming pool lights functioning properly, its light panel box and cables. If any fault found to inform the client and get it replaced.

Check Visually & Inspect all Gutter Channels

Check for any Grating replacement which needs to be done

Check lifesaving equipment( reach poles, throw rings, rescue tubes, backboard)

Foot Valve

NRV

Tubing

Dive

( Includes the complete Star  Maintenance Plan plus Complete Pool maintenance including Chemical)

Check Circulation Systems

Check Filter ( Pressure gauge, Valve, Cap )

Check Filter Media Inside the filter

Replace Filter media inside the filter

Leakage if any to be arrested

Open Backwash to remove dirt

Pressure Gauge replacement if damage

Pump basket Stainer Cleaning

Pump Suction Stainer Cleaning

Check Pumps for any Noise, Power Rating, Suction Basket

Repair and replace pump parts i.e if required

  1. Old winding Heating, Packing, Servicing and Varnishing charges
  2. Replacement of SKF Make Ball Bearing( 4 PCs)
  3. Mechanical Seal
  4. New 50MT Running Capacitor
  5. O Ring Set
  6. Pump removing fitting testing and painting and transport

Ozonation

UV Systems

Inoization

Salt Chlorinator

Check whichever system is installed

Check Complete Performance of Heat pump and Circulation Pump

( Gas Refill, Display Panel, Compressor)

Temperature Check

Ph( Ideal 7.2 – 7.6)

Chlorine (1.5 – 2.5)

Alkalinity (80-120)

TDS

Total Hardness

Temperature ( If temperature Controlled Pool)

Advice Chemical Saving and Instruct Chemical Dosing

Water Test Report

Pool Water Chemistry Balacing (Chemical to be provided by client)

Check all fixtures in pool Visually( i.e Suction Nozzle, Drain Nozzle, Vaccum Nozzle, Underwater light if provided)

Checkup of all electrical parts in panel(( i.e All contractors, relay, MCBs, VFD, Timers, Starters if any)

Check for all loose cables and if found loose needs to be tight

Check for any cable replacement and inform the same to the client

Check all swimming pool lights functioning properly, its light panel box and cables. If any fault found to inform the client and get it replaced.

Check Visually & Inspect all Gutter Channels

Check for any Grating replacement which needs to be done

Check lifesaving equipment( reach poles, throw rings, rescue tubes, backboard)

Foot Valve

NRV

Tubing

Terms and Conditions

 

1 – Visit are accounted as per Package

2 – Every Visit there will be a service report provided to the client. Any rectification/ Replacement required then client has to do the same on their end. If System breaks down then WPS is not responsible

3 – Any licenses required the same has to be procured by the client. WPS is a service provided only

4 – If equipments purchased and Installed from WPS then WPS will provide additional Visit free in case of any problems and breakdown.

5 – Client has to provide fresh Water required/ Proper space for electrical equipments to avoid any shocks.

6 – WPS may reschedule on any service date if unavailability of technician or service engineer.

7 – WPS takes full responsibility on negligence or omissions of all its employees on the client.

8 – Contract will require payment on schedule basis and it may be cancelled or services will be delayed if non payment of fees occur.

9 – Client has to keep adequate stock of chemicals for our technician to give proper guidance for dosing.

10 – Any disputed items needs to be brought to our notice and w will find the possible solution for the same.

11 – Payment terms will be provided upon the package selected by Client.