Situation Analysis

One on one meetings to understand the requirements of the Client to frame a sales proposal accordingly

Design is paramount to the maintain balance between aesthetics and functionality. Hence we tailor make it to your preference incorporating shape of the pool, lighting , filtration , pool finish and the works.

Emphasis on design selection and closure with an agreement to go ahead and construct your dream pool is the way to go.

Design

WPS offers a bouquet of design services encompassing Swimming Pool, Steam, Sauna and Water bodies. A continues integrated effort involving discussions with architects, structural consultant, landscape architects, MEP consultants to ensure that the right layout and plan is in place.

Post discussion with the experts , we have an AUTOCAD drawing as a representation of these consolidated and valued inputs which is submitted for approval. Our diligent in house team gets this coordinated with the client seamlessly.

Drawing and Planning

The intricacies of the exact location of pool with plant room and pipe routing is clear in the AUTOCAD drawing. Th drawing is sacrosanct as the most integrated point of reference to know exact levels and enable execution. Hence, once the drawing is prepared and GFC released the plant detailing is rolled out.

Build

Post composition of the detailed plan the preparation for a complete schedule is initiated to track the work from start to finish:

  • Procurement of material
  • Laying if pipes and conduits
  • Installation of filtration plant
  • Installing of pool tiles
  • Filling up the swimming pool with water

Delivery

Once the above steps are undertaken and water is filled to be commissioned , a 7 day test to check leakages or any such issues and mitigate them within the specified time is done, before a final handover

Handover

The 7- day tests having been completed; the pool is handed over to the client with a suggestion for AMC (Annual Maintenance Contract).  Post handover a warranty of 1 year is provided to the client and then a comprehensive or a non comprehensive package is finalised for the following 5 years.